Project Details
-
Construction Date
August - November, 2020
-
Location
Silt, CO
-
Construction Investor
Private
- Categories:
Project Description
JCI installed a bypass lane for the new roundabout construction. A large diameter storm drain line was installed along with irrigation lines. New paving and concrete for the roundabout was installed within the CDOT right of way. A new pedestrian crossing was added for safety for crossing HWY 6.