Project Details

  • Construction Date

    August - November, 2020

  • Location

    Silt, CO

  • Construction Investor

    Private

  • Categories:

Project Description

JCI installed a bypass lane for the new roundabout construction. A large diameter storm drain line was installed along with irrigation lines. New paving and concrete for the roundabout was installed within the CDOT right of way. A new pedestrian crossing was added for safety for crossing HWY 6.