Project Details
-
Construction Date
Summer 2017
-
Location
Rifle, CO
-
Construction Investor
City of Rifle
- Categories:
Project Description
This project consisted of the installation of approximately 3,600 linear feet of water main consisting of 12” and 16” diameter PVC C900/C905 water main. The project starts near the intersection of East 1st Street and Whiteriver Ave and terminates in Wapiti Court. The route includes crossings of Highway 6, Bridges over the railroad and Colorado River, and Off ramp crossings of Interstate 70, City Street right of ways and private properties. The project includes trenching, directional boring under Interstate 70, traffic management, site dewatering, and hanging of watermain along Highway 13 bridge into Rifle.